Bedok → East Coast MRT Link
A structured first- and last-mile cycling corridor connecting Bedok Reservoir residential areas to Marine Terrace MRT (TEL) via a combination of park connectors and low-traffic local streets.
The route begins at Bedok Reservoir Park and follows the Bedok Park Connector Network south through residential precincts, providing a relatively continuous and accessible cycling path toward the East Coast. It then connects into the Marine Parade area, linking directly to Marine Terrace MRT as a key public transport node.
This corridor demonstrates how existing PCN infrastructure can support Walk-Cycle-Ride (WCR) journeys, while also highlighting specific gaps where riders are required to transition onto on-road segments. These sections present clear opportunities for future infrastructure improvements, such as protected lanes or enhanced crossings.
Overall, the route provides a practical, replicable model for improving first-mile and last-mile connectivity in mature residential towns, supporting mode shift toward active mobility and public transport integration.